Current statusPlanning permit application lodged with the DTP in July 2026. Public notification underway.Application document on public notice: PA2604511Current statusPlanning permit application lodged with the DTP in July 2026. Public notification underway.Application document on public notice: PA2604511
Current statusPlanning permit application lodged with the DTP in July 2026. Public notification underway.Application document on public notice: PA2604511Current statusPlanning permit application lodged with the DTP in July 2026. Public notification underway.Application document on public notice: PA2604511
Our Partners

Delivery through local expertise

The Mahā-Mandir is being shaped by a team of respected specialists, each bringing deep expertise to their field.

Planning, design & landscape

Working with BAPS on the Melbourne Maha-Mandir project has been a privilege. Over the course of the planning process, we have witnessed a remarkable commitment to creating a place that reflects cultural heritage, community connection and long-term stewardship.

We are proud to have supported the project team in navigating a complex planning pathway and helping to shape a proposal that has been informed by extensive technical investigations and careful consideration of its environmental and community context.

Rebecca West Partner, Urbis

Peter Haack Consulting undertook a Landscape and Visual Impact Assessment (LVIA) for the Project including accompanying photosimulations. All were prepared utilising professionally accepted methodologies.

The LVIA found that the landscape setting has a generally high capacity to absorb change and that overlooking from sensitive viewpoints is not possible. As a result, for most surrounding sensitive viewpoints, even relatively low vegetation to eye-height is effective at screening views.

However, where impacts were identified, recommendations were made to the architectural and landscape architectural teams so that ameliorative actions could be incorporated into the design response.

Peter Haack Consulting Landscape & visual impact

Designing the Hindu temple for BAPS Swaminarayan Sanstha Australia has been a unique opportunity to explore how architecture can support spirituality, worship and community.

One of the key challenges has been responding to the significant cultural and religious requirements of the temple while creating a building that is welcoming and connected to its broader setting.

Working closely with BAPS throughout the design process, we have sought to translate their traditions and values into the architecture, while carefully considering the temple’s scale, form, arrival experience, landscape and relationship with the surrounding community. The result is a design that aims to provide a meaningful place for worship and gathering, while establishing a strong and considered architectural presence.

Rob Alessi Principal, Peddle Thorp

The BAPS Hindu Maha-Mandir, Melbourne project has required a considered response to a range of cultural, environmental and technical matters. A key focus has been protecting the identified Glossy Grass Skink habitat and retaining the existing vegetation across the southern portion of the site.

Working closely with BAPS and the consultant team, we have redesigned and repositioned the buildings within the developable area to minimise impacts on this natural habitat. This has been achieved while maintaining the project’s intended capacity, cultural significance and visitor experience.

The landscape design goes beyond simply protecting the existing habitat. Over time, the site will be regenerated with locally indigenous vegetation to strengthen habitat corridors and improve biodiversity. Engagement with the Bunurong Land Council Aboriginal Corporation is also informing opportunities for walking trails, interpretation and cultural storytelling throughout the landscape.

The design shows how environmental protection, cultural understanding and ambitious architecture can work together. BAPS intends to open its doors to the wider community, providing a genuine cultural experience and a welcoming place for worship, reflection and connection. We believe it has the potential to become an important landmark for Victoria’s Hindu community.

Rob Page Director, Peddle Thorp

From the outset, we recognised that the BAPS Hindu Mahā-Mandir is more than a building. It is a place of spiritual, cultural and community significance that will serve generations of Melbourne’s growing Hindu community. Our approach has been to develop a landscape that reflects the Mandir tradition while responding sensitively to its Australian setting. The project establishes a distinctive sense of place through the relationship between architecture, landscape and Country, reflecting both the cultural aspirations of the Mandir and the character of its broader setting.

A key focus of our work has been balancing the aspirations of the temple with the environmental and planning opportunities of the site. The landscape is an essential part of the vision, incorporating habitat enhancement, increased native planting, integrated water management and thoughtful visitor experiences. Together, these interventions contribute ecological, cultural and community outcomes while providing spaces for gathering, reflection and connection.

Aspect Studios Landscape architecture
Ecology, environment & water

As a specialist in wildlife conservation, I have been working with BAPS and the project team to address potential impacts to nationally threatened species.

I have been impressed by BAPS’ proactive approach, which has extended beyond avoiding impacts to identifying opportunities to improve habitat quality and connectivity for wildlife. If implemented carefully, these measures have the potential to deliver meaningful long-term benefits for threatened reptiles on the site, such as the Glossy Grass Skink and other native fauna.

Jules Farquhar Principal Ecologist, Squamata Ecology

Nature Advisory was engaged by BAPS Swaminarayan Sanstha Australia Ltd to undertake a range of ecological assessments and surveys to support the preparation of a planning permit application. This included a Flora and Fauna Assessment and targeted surveys for a number of threatened species.

A key ecological consideration for the proposed development was the identification of the EPBC-listed Glossy Grass Skink on the site. In response to this finding and subsequent advice, the development underwent extensive redesign to avoid impacts to the species, resulting in a larger area of land being retained and protected from development.

A Wildlife Management Plan and a Land Management Plan were then prepared to mitigate indirect impacts and enhance ecological values in the retained areas. In addition to the ecological assessments, Nature Advisory also prepared a Bushfire Management Plan and a Bushfire Emergency Management Plan for the proposed development.

Nature Advisory

Working alongside the wider consultant team, we assessed almost 2,000 trees on the site, compared the tree impacts of each design option and made recommendations to inform a revised design aimed at reducing those impacts.

Melbourne Tree Care

Eco Vision Australia provided an agricultural survey including environmental considerations for the development. This well-aligned development attains a balance between the land suitability combined with environmental responsibility.

The site has key and significant biodiversity areas that will be protected and enhanced through a comprehensive environmental management plan. The predominant environmental consideration is to protect and enhance an approximate 7.5ha of indigenous vegetation located within the south east corner including additional properties to the south for the Glossy Skink Habitat.

The site has limited suitability for intensive farming with limited agricultural value, with greater emphasis placed on biodiversity protection and enhancement.

Robert Krainz Land Management Consultant, Eco Vision Australia

Water Studio prepared the Stormwater Management Plan for the BAPS project. The key challenge was the Glossy Grass Skink habitat, which depends on the site staying damp without being flooded. After walking the site with Jules Farquhar of Squamata Ecology, we designed the drainage so the habitat keeps getting the water it relies on.

The existing dam in the west will be upgraded into a wetland that treats runoff and passively returns it to the natural overland flow path, similar to the existing flow regime. Across the rest of the site, wetlands and raingardens treat stormwater beyond EPA best practice targets. Treated stormwater is also captured in a storage pond to irrigate the gardens and landscaped areas while a retarding basin limits peak flows to the downstream environment.

BAPS has let water and ecology shape the site layout, and the design is better for it.

Water Studio Stormwater & integrated water

Marshall Day Acoustics prepared a planning stage environmental noise assessment for the proposed BAPS Hindu Maha-Mandir project (Rp 003 R04 20240727 – BAPS Hindu Maha-Mandir, Melbourne – environmental noise assessment dated 22 April 2026).

The assessment included measurements of the existing noise environment, in particular the noise generated by road traffic on Western Port Hwy, as well as locations further from the road. The noise measurements were considered in conjunction with relevant Victorian policy and industry standards to establish noise limits and targets for various noise sources. The noise sources that were considered included low-level outdoor background music, short-duration outdoor amplified ritual music, indoor music, carparking, patrons, mechanical services, waste collection and deliveries.

Using predictive noise modelling, the assessment found that each noise source can achieve the relevant limits and targets during the proposed operating hours through careful design of outdoor amplification systems, installation of perimeter noise barriers at specific locations, appropriate design of mechanical services systems, and by restricting the allowable hours for waste collection and deliveries.

Further details can be found in the full assessment.

Marshall Day Acoustics Acoustics
Engineering & technical

Throughout the planning process, we have seen the commitment of BAPS to ensuring the traffic waste management for the proposal not only met the day to day demands but strove to ensure that larger events could be safely managed and minimise impacts to the surrounding area.

Through considered consultation with Department of Transport and Planning and the relevant stakeholders the project will incorporate major upgrades to the intersection of Western Port Highway and Homewood Road, as well as its site access points to Western Port Highway to ensure appropriate operation of the surrounding network.

Waste management for the site actively encourages both staff/volunteers and visitors of the site to reduce waste disposal and aligns with the hierarchy of Sustainability Victoria with an ongoing review and monitoring process in place to ensure that the site continues to meet its waste and recycling requirements.

Throughout the process, we have enjoyed the opportunity to work collaboratively with BAPS to develop a proposal which brings together a community whilst addressing the traffic, parking and waste considerations moving forward.

Traffix Group Waste Management Service

Cossill & Webley (CW) has been pleased to support BAPS & Urbis through the rezoning process to facilitate the transformation of low-density residential properties into a new place of worship.

CW’s involvement to date has included completing an engineering servicing report, providing strategic advice, and preparing preliminary earthwork models.

As the location sits outside the Urban Growth Boundary, the sewer is remote from the authority network. As such, we have worked closely with the water authority on potential sewer solutions. Our focus was to ensure sewage was conveyed off site to the gravity network, rather than risk the on-site ecology by having treatment on site via a septic system. CW has also worked alongside other consultants to create an alignment for the sewer rising main that minimises disruption to the existing community and minimises harm to flora and fauna.

The earthwork models have been created strategically, focused on minimising cut and fill by responding to the existing topography and retaining as much vegetation as possible.

CW is incredibly excited to be involved in this project and has thoroughly enjoyed working alongside the BAPS team and all of their consultants. CW is looking forward to continuing to support BAPS as it progresses through the rezoning and future design stages.

Cossill & Webley

Traffic management and parking is a key consideration of the development, ensuring that not only day to day demands are met onsite and managed safely, but larger events can be safely managed by the surrounding road and all parking can be accommodated within the site boundaries.

The proposal undertook an assessment of the car parking demands expected to be generated by the site to ensure that the parking demands for the site can be accommodated on the site. The typical day-to-day operations of the site will be accommodated within the formalised parking areas on the site, with larger event demands facilitated by overflow car parking areas. The proposal will operate with an online booking system for parking to further ensure that the demands generated by the site can be accommodated, whilst further assisting with the management of the maximum patrons attending the site per hour.

Through considered consultation with Department of Transport and Planning and detailed analysis of the surrounding infrastructure, the project incorporates major upgrades to the intersection of Western Port Highway and Homewood Road, as well as its site access points to Western Port Highway to ensure appropriate operation of the surrounding network.

During large events, temporary traffic management devices will be introduced to further mitigate any impacts to the surrounding network. These temporary measures include, but are not limited to, variable messaging signs, speed limit reductions and additional parking restrictions and tow-away zones along the frontages of the site.

These changes will safely manage traffic movements into and out of the site and where possible implement strategies to mitigate any impact to the surrounding network.

Traffix Group Traffic Management Service

The lighting for BAPS Hindu Mahā-Mandir has been planned to support both people and the natural environment. It will provide safe, practical light for car parks and shared spaces while reducing light spill, glare and unnecessary light into nearby sensitive areas.

To achieve this, the lighting will be kept low and directed only where it is needed. Shields, timers and motion sensors will help limit glare and reduce the time lights are on, while warmer lights will be used to help minimise disturbance to wildlife. Where helpful, vegetation can also be used to screen and soften the light.

In simple terms, the lighting has been designed so the site can be used safely and comfortably without placing extra pressure on the surrounding landscape or local wildlife, including the Glossy Grass Skink habitat, retained woodland and wildlife corridors.

NDY A Tetra Tech Company · Sustainability & services

BAPS Hindu Mahā-Mandir has included sustainability planning to help reduce energy and water use, support better site performance and respond to local planning requirements. The approach considers practical measures such as efficient fixtures, solar power, waste reduction, stormwater management and the use of recycled or locally sourced materials where possible.

The sustainability pathway also looks at ways to support landscaping and biodiversity; the design will focus on retaining and protecting existing native vegetation and wildlife habitat and improving on the existing ecological and biodiversity value.

NDY A Tetra Tech Company · Sustainability

The air conditioning strategy for BAPS Hindu Mahā-Mandir has been reviewed to suit the different buildings and the way they will be used. The options considered balance comfort, cost, maintenance, efficiency and long-term performance, while also supporting areas with higher visitor numbers and more demanding cooling needs.

The aim is to provide a system that is practical to operate, reliable for the site and suitable for the variety of spaces across the project.

NDY A Tetra Tech Company · Mechanical / air conditioning services

The electrical supply strategy for the project is focused on reliability, supporting renewable energy and avoiding unnecessary complexity or cost. The review considered low-voltage and high-voltage supply options, any future expansion and how the system would fit with the overall site design.

The preferred approach supports the use of solar power through PV inverters and PV distribution boards and takes account of the fact that the site’s everyday electricity use is expected to be lower than its peak demand.

NDY A Tetra Tech Company · Electrical services
Heritage

Austral Archaeology has valued working with BAPS Hindu Maha-Mandir Melbourne as part of the consultant team for heritage. In our role advising on Aboriginal cultural heritage, we have seen BAPS take a thoughtful and engaged approach to understanding both the tangible and intangible cultural heritage values of the site.

BAPS has supported ongoing involvement from the Bunurong Land Council Aboriginal Corporation and has been receptive to the perspectives shared throughout the heritage assessment. We have appreciated the opportunity to work with a project team that gives cultural heritage and stakeholder engagement careful consideration.

Austral Archaeology Aboriginal cultural heritage